Skip to content
  • Home
  • About EMTSP
    • Oversight Panel
    • Revised Mission & Goals
  • Technical
    • Scan Tour
    • Surveys
  • Videos
  • Training
    • EMTSP Web-based Training
  • Specifications
    • MnDOT
      • Various – DOT Maintenance Equip.
    • NJDOT
      • Various – DOT Maintenance Equip.
    • NHDOT
      • Snow and Ice Equipment Category
      • Truck, Cab & Chassis
    • ConnDOT
      • Various – DOT Equipment Maintenance Specifications & Contracts
    • PennDOT
      • Excavator
      • Truck Cab & Chassis With Snow & Ice Equipment
    • ODOT
      • Backhoe/Loader
      • Rollers
  • Links
  • Vendor
  • Site Map
← Georgia DOT Tests Highly Modified Binder at Problem Intersection
Bonded Wearing Course as a Pavement Preservation Strategy in Caltrans District 4 →

Asphalt Rubber Chip Seals with Warm Mix Test Strip in Caltrans District 6

2010-12-23

With the advance of warm mix technologies, Caltrans tried an innovation project using a warm mix additive to reduce the application temperature of an AR chip seal.  Read the full article in the California Pavement Preservation Center’s Newsletter, No. 16, December 2010, Page 4.

This entry was posted in General News, New Technology, News, Pavement Pres. Apps., Treatments. Bookmark the permalink.
← Georgia DOT Tests Highly Modified Binder at Problem Intersection
Bonded Wearing Course as a Pavement Preservation Strategy in Caltrans District 4 →

Comments are closed.

  • EMTSP Search

  • Partnership Meetings

    2025 SSEMC Annual Meeting
    June 2-6 (Ashville, NC)


    2025 MW/NE Joint Annual Meeting
    June 17-20 (Indianapolis, IN)


    2025 WSHEMA Annual Meeting
    October 13-16 (Salt Lake City, UT)


  • State Contact Lists

    Click Here
  • Travel Request Form

    Download
  • Case Studies

    Click Here

  • Contact Us

    Email:  ncpp@egr.msu.edu
    Phone:  (517) 432-8220
  • Address

    2857 Jolly Road
    Okemos, MI 48864
    Map
  • Hours of Operation

    8 am - 5 pm
    Eastern Time
© 2025 - EMTSP